Flange Hole Marker

Flange Hole Marker

by LetsFab

910+ reviews
Android application Flange Hole Marker screenshot

Flange Hole Marker

This App Calculate Flange Hole Dividing Hole Marking for Equispaced Flange Holes, Flange Holes at any angle and Equivalent No.
of Holes.This App Has Following Calculators:1.
Equispaced Flange Hole Marking Calculator.2.
Flange Holes at any Angle Marking Calculator.3.
Equivalent No.
of Holes Calculator.How to Use This App:1.
Equispaced Flange Hole Marking Calculator : This Tool is useful for Calculating Hole Dividing Marking for Flange Having Holes at Equal Distance or Equispaced.
In this Tool You Have to enter input as Flange Hole Pitch Circle Diameter (P.C.D) in mm or Bolt Circle Diameter (B.C.D) in mm, No of Holes in nos then click on Calculate Button then it will give you result as Flange Hole Dividing Marking Distance and this Distance is used for Marking Flange Holes Dividing.2.
Flange Holes at any Angle Calculator : This Tool is useful for Calculating Dividing marking for Flange having Holes at any angle.
In this Tool You Have to enter input as Flange Hole Pitch Circle Diameter (P.C.D) in mm or Bolt Circle Diameter (B.C.D) in mm and Hole Angle in Degree then click on Calculate Button then it will give you result as Flange Hole Dividing Marking Distance and this Distance is used for Marking Flange Holes Dividing.3.
Equivalent No.
of Holes Calculator : This Tool is useful for Calculating No.
of Holes can be equally Marked in to Desired Circle for required diameter.
It is basically to estimate how much hole or maximum no of holes can be fitted in to circle.
In this tool you have to Input is required as Circle Diameter in mm In which I have to Place small diameter hole.
and small diameter in mm.
then click on calculate button and this tool give you result as maximum no of holes we can marked in desired circle for required diameter.It can be very helpful for Piping Industry, Flange Machining Industry or Flange Hole Marking Industry.This app is very useful during hole center Marking on flange at a given Pitch Circle Diameter or Bolt Circle Diameter.
This app gives hows much cord length required to divide required No of hole on our available Pitch Circle Diameter or Bolt Circle Diameters.This app is very useful for those who are dealing with flange hole marking or bolt hole marking on flanges or any other application where we had to divide required no of parts on pitch circle diameter.This app is for professional and any other who are working in the field of fabrication of process equipment such as pressure vessel, heat ex changer, storage tank,reactor, agitator or mixer and heavy engineering Equipment.
Features
🍽️

Food & Dining

Discover recipes and order food from your favorite restaurants.

💬

24/7 Support

Our dedicated support team is always ready to help you.

Screenshots

See Flange Hole Marker in Action

Flange Hole Marker Screen 1
Flange Hole Marker Screen 2
Flange Hole Marker Screen 3
Flange Hole Marker

Get the App Today

Get it on Google Play

Available for Android 8.0 and above

Love this app?

Share it with friends and family on your favorite social network.

Ask AI about this app

Get instant answers about features, tips and more from popular AI assistants.